Wilcox Boulevard Bridge Undergoing Repairs to Expansion Joints

CHATTANOOGA,TN (WDEF) The Wilcox Boulevard bridge is getting repairs to its expansion joints.

To ensure safety, one side of the bridge will close, while the other side stays open.
C-DOT is urging drivers not to speed through the area as work crews will be on-site, and extra caution is needed.
“Thankfully, it’s next Wednesday and Thursday, between 8:30 AM and 4:00 PM,” said Justin Strickland, Public Space Coordinator. “We’ll be reducing the bridge to two lanes—one lane in each direction. The Wilcox Boulevard bridge is actually two separate bridges.”
Repairs are scheduled from 8:30 a-m to 4 p-m and Thursday.
Categories: Featured, Local News